🚚
SEO & marketing

SEO migration: a checklist to preserve traffic when moving

13.01.2025
← All articles

SEO migration is the strategy of preserving rankings and traffic during major site changes. Done wrong, you lose 30-80% of traffic; recovery takes 6-12 months.

Types

1. Platform. 2. URL structure. 3. Domain. 4. HTTPS. 5. Redesign.

Preparation

1. Document every URL (Screaming Frog). 2. Top pages from GSC. 3. Backlink profile. 4. Ranking baseline.

URL mapping

Old URL → New URL in a sheet. Keep URLs unchanged when possible.

301 redirects

Not 302. Permanent and passes signals. .htaccess or Nginx config.

Sitemap.xml

New sitemap submitted to GSC.

Internal linking

Find & Replace for all links.

Schema and meta

Carry over fully.

Staging tests

Screaming Frog before and after.

Migration day

Lowest-traffic window. 4 hours: migrate, test, update sitemap, GSC.

Post-migration

Monitor for 4 weeks. 404s, traffic, rankings. First 2 weeks drop is normal.

Fixing 404s

GSC \"Not found\". 301 each.

HTTPS

All resources HTTPS. HSTS.

Domain change

Hardest. GSC \"Change of address\". Keep old domain a year.

Sayt.uz

2024 PHP framework → custom CMS. 3 months of prep. 10% drop for 2 weeks, +15% after 8 weeks.

Related articles

📈 Analysing the Search Console Performance report: clicks, CTR and position 📦 Out-of-Stock Products: Delete, Redirect or Keep the Page? 📊 How to Read an SEO Report: The Metrics That Really Matter ⚠️ Site reputation abuse: the risk of hosting third-party content
🌐 Language
🇺🇿 O⁠'zbek 🇺🇿 Özbek (yangi) 🇺🇿 Ўзбек 🇷🇺 Русский 🇬🇧 English ✓